Bioland Purification Systems – Biogas Project

Project Description

Customer: Bioland Arıtma Sistemleri Müh. Const. Max. Manufacturing Industry Tic. Ltd.
Location: Uzbekistan

Work Done: Uzbekistan Tano Biogas project consultancy works.

Description

Tano is a biogas farm that produces biogas from animal manure and also stabilizes animal manure and turns it into fertilizer. It is a biogas plant. The plant is a biogas plant that operates a cogeneration system with a capacity of approximately 65 kWe within its own structure. The plant provides its own heat needs from the heat boiler and engine heat installed in the exhaust of the cogeneration system. In this context, the plant’s process studies, technical support for assembly, administrative and machine room architectural drawings, Technical consultancy services were provided for biogas balloon repair and installation, personnel training and commissioning of the facility. During the balloon installation and field inspection processes, field work was carried out by going to the field in person.

Sukkar Şeker – Wastewater Treatment Plant

Project Description

Customer: Sukkar Şeker Üretim Inc. Co
Location: Erzincan
Start Date: 01.10.2023
End Date: 10.10.2023

Work Done: Erzincan Sugar Factory Wastewater Treatment Plant Commissioning Works.

Description

This system is a wastewater treatment plant established using the UASB anaerobic reactor. The plant inspection was carried out, the necessary training was given to the personnel, the necessary sludge calculations were made for the commissioning of the plant and anaerobic sludge loading was carried out, and the daily analysis of the plant was taken into account. Wastewater loading quantities were determined and loading was done and the facility was successfully put into operation. Engineering support was provided by staying in the field for 9 days, then remote technical support was provided for 1 month.

Konya Şeker – Supervisory Service

Project Description

Customer: Konya Şeker San. ve Ticaret Inc. Co
Location: Konya
Work: Consultancy
Capacity: 300m3/h
Start Date: 10.08.2020
End Date: 25.08.2020

Work Done: Providing supervision services for the inspection and commissioning of Konyaşeker San. ve Tic. Seydibey TÜİET wastewater treatment plant UASB reactor.

Explanation

Following the Facility Inspections, dome repairs and sub-distribution pipes were revised and repaired. Following these operations, personnel training was provided for the UASB reactor and the reactor was put into operation.

Konya Şeker – Consulting Service

Explanation: Preparation of flow, P&ID and layout projects for the 2.7 MW capacity Biogas to Electricity Production Plant, anaerobic systems and general system heat calculations, determination of waste heat capacities and preparation of heat distribution report according to anaerobic system and general heat requirement, heating systems piping projects.

Project Description

Customer:  Konya Şeker San. ve Ticaret Co. Inc.
Location: Konya
Work: Consultancy
Start Date: 09.11.2018
End Date: 30.10.2019

Work Done: Konyaşeker San. Ve Tic. Inc. Co. Providing consultancy services for electricity generation works within the scope of YEKDEM with biogas obtained from Seydibey TÜİET Solid Waste Facility and Wastewater Treatment Plant and providing consultancy services for determining whether the treatment of biogas plant effluents will be sufficient by preparing the project report of the wastewater treatment plant.

  • Calculation of the capacity of units, equipment and pipe systems for biogas conditioning. Project design of biogas equipment pipes and units.
  • Preparation of biogas system specifications.
  • Providing technical support by being present on site during the installation of all equipment and pipes.
  • Providing technical support for the rehabilitation of solid waste units and heat exchanger systems within the scope of biogas production systems.
  • Preparation of a project report by redoing process calculations to determine whether the capacity of the existing wastewater treatment plant to treat wastewater coming from the biogas plant will be sufficient, Providing technical support for the revision of the plant.