Project Description

Customer: Sukkar Şeker Üretim Inc. Co
Location: Erzincan
Start Date: 01.10.2023
End Date: 10.10.2023

Work Done: Erzincan Sugar Factory Wastewater Treatment Plant Commissioning Works.

Description

This system is a wastewater treatment plant established using the UASB anaerobic reactor. The plant inspection was carried out, the necessary training was given to the personnel, the necessary sludge calculations were made for the commissioning of the plant and anaerobic sludge loading was carried out, and the daily analysis of the plant was taken into account. Wastewater loading quantities were determined and loading was done and the facility was successfully put into operation. Engineering support was provided by staying in the field for 9 days, then remote technical support was provided for 1 month.