Project Description
Customer: Eti Maden Kırka Kırka Borax Operations Directorate
Capacity: 5m3
Material: ST 37, Solution contact surfaces are coated with neoprene.
Start Date: 09/15/2021
End Date: 12/10/2022
Works Done: Energy Unit Demineralized Water Plant Acid measurement tank supply and installation
Explanation
The existing acid measuring tank was disassembled and taken to the scrap yard. The new acid measuring tank was assembled, tested and delivered.

HCl Solution Preparation Tank Appearance During Installation

HCl Solution Preparation Tank Label

Appearance After Installation of HCl Solution Preparation Tank