Project Description

Customer: Eti Maden Kırka Kırka Boraks Business Directorate
Location: Eskişehir
Capacity: 20m3/h
Fans: 2 Units. Each fan capacity 2500Nm3/h, material stainless.
Pumps: Horizontal Centrifugal monoblock, 20m3/h, 3 bar, material stainless.
Start Date: 28.02.2023
End Date: 29.05.2023

Works Done: Energy Unit Demineralized Water Plant Degasser system design, construction and delivery.

Explanation

The existing deaerator was disassembled and taken to the scrap yard. The new deaerator system (including air fans and pumps) was assembled, tested and delivered.