Project Description
Customer: Eti Maden Kırka Kırka Boraks Business Directorate
Location: Eskişehir
Capacity: 20m3/h
Fans: 2 Units. Each fan capacity 2500Nm3/h, material stainless.
Pumps: Horizontal Centrifugal monoblock, 20m3/h, 3 bar, material stainless.
Start Date: 28.02.2023
End Date: 29.05.2023
Works Done: Energy Unit Demineralized Water Plant Degasser system design, construction and delivery.
Explanation
The existing deaerator was disassembled and taken to the scrap yard. The new deaerator system (including air fans and pumps) was assembled, tested and delivered.

