{"id":1466,"date":"2015-02-13T07:55:56","date_gmt":"2015-02-13T04:55:56","guid":{"rendered":"https:\/\/derinar.com.tr\/?post_type=portfolio&#038;p=1466"},"modified":"2024-10-08T02:48:03","modified_gmt":"2024-10-07T23:48:03","slug":"konya-seker-consulting-service","status":"publish","type":"portfolio","link":"https:\/\/derinar.com.tr\/en\/derinar\/konya-seker-consulting-service\/","title":{"rendered":"Konya \u015eeker &#8211; Consulting Service"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row row_type=&#8221;row_center_content&#8221; bg_position=&#8221;left top&#8221; bg_repeat=&#8221;no-repeat&#8221; row_text_color=&#8221;row_text_select&#8221; border_style=&#8221;solid&#8221; padding_top=&#8221;10&#8243; padding_bottom=&#8221;10&#8243;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;1141&#8243; border_color=&#8221;grey&#8221; img_link_target=&#8221;_self&#8221; img_size=&#8221;blog-large&#8221;][vc_single_image image=&#8221;1145&#8243; border_color=&#8221;grey&#8221; img_link_target=&#8221;_self&#8221; img_size=&#8221;blog-large&#8221;]<\/p>\n<p align=\"justify\"><strong>Explanation<\/strong>: Preparation of flow, P&#038;ID and layout projects for the 2.7 MW capacity Biogas to Electricity Production Plant, anaerobic systems and general system heat calculations, determination of waste heat capacities and preparation of heat distribution report according to anaerobic system and general heat requirement, heating systems piping projects.<\/p>\n<p>[vc_column_text]<\/p>\n<p>[\/vc_column_text][\/vc_column][vc_column width=&#8221;1\/2&#8243;]\n\t<div class=\"custom-heading wpb_content_element  heading-medium\">\n\t\t<h2 class=\"heading-title\" >Project Description<\/h2>\n\t\t<span class=\"heading-line primary\"><\/span>\n\t<\/div>[vc_column_text]<strong>Customer<\/strong>:\u00a0 Konya \u015eeker San. ve Ticaret Co. Inc.<br \/>\n<strong>Location<\/strong>: Konya<br \/>\n<strong>Work<\/strong>: Consultancy<br \/>\n<strong>Start Date<\/strong>: 09.11.2018<br \/>\n<strong>End Date<\/strong>: 30.10.2019<\/p>\n<p align=\"justify\"><strong>Work Done<\/strong>: Konya\u015feker San. Ve Tic. Inc. Co. Providing consultancy services for electricity generation works within the scope of YEKDEM with biogas obtained from Seydibey T\u00dc\u0130ET Solid Waste Facility and Wastewater Treatment Plant and providing consultancy services for determining whether the treatment of biogas plant effluents will be sufficient by preparing the project report of the wastewater treatment plant.<\/p>\n<ul style=\"text-align: justify;\">\n<li>Calculation of the capacity of units, equipment and pipe systems for biogas conditioning. Project design of biogas equipment pipes and units.<\/li>\n<li>Preparation of biogas system specifications.<\/li>\n<li>Providing technical support by being present on site during the installation of all equipment and pipes.<\/li>\n<li>Providing technical support for the rehabilitation of solid waste units and heat exchanger systems within the scope of biogas production systems.<\/li>\n<li>Preparation of a project report by redoing process calculations to determine whether the capacity of the existing wastewater treatment plant to treat wastewater coming from the biogas plant will be sufficient, Providing technical support for the revision of the plant.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>[vc_row row_type=&#8221;row_center_content&#8221; bg_position=&#8221;left top&#8221; bg_repeat=&#8221;no-repeat&#8221; row_text_color=&#8221;row_text_select&#8221; border_style=&#8221;solid&#8221; padding_top=&#8221;10&#8243; padding_bottom=&#8221;10&#8243;][vc_column width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;1141&#8243; border_color=&#8221;grey&#8221; img_link_target=&#8221;_self&#8221; img_size=&#8221;blog-large&#8221;][vc_single_image image=&#8221;1145&#8243; border_color=&#8221;grey&#8221; img_link_target=&#8221;_self&#8221; img_size=&#8221;blog-large&#8221;] Explanation: Preparation of &#8230;<\/p>\n","protected":false},"author":1,"featured_media":1467,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"portfolio_category":[77],"portfolio_tag":[],"class_list":["post-1466","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio_category-consulting"],"_links":{"self":[{"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/portfolio\/1466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/comments?post=1466"}],"version-history":[{"count":2,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/portfolio\/1466\/revisions"}],"predecessor-version":[{"id":1471,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/portfolio\/1466\/revisions\/1471"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/media\/1467"}],"wp:attachment":[{"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/media?parent=1466"}],"wp:term":[{"taxonomy":"portfolio_category","embeddable":true,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/portfolio_category?post=1466"},{"taxonomy":"portfolio_tag","embeddable":true,"href":"https:\/\/derinar.com.tr\/en\/wp-json\/wp\/v2\/portfolio_tag?post=1466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}